Drawlloween – Day 7

Another day, another Drawlloween.

Today’s subject was “Haunted House” and this is what I came up with.

Drawlloween Haunted House

You can check out my previous entries here.

Drawlloween – Day 6

Drawlloween Continues!

We’re on Day 6 – Pumpkin!

This one was a little bit different because I had a really clear idea of what I wanted to draw as soon as I saw Pumpkin on the list. I love Jack-O-Lanterns, and I’ve wanted to draw a big-cartoony Pumpkin Poster for a while. This is pretty much as I saw it in my mind. I drew it in Manga Studio, coloured using the basic fill in pen and then shaded using black inks over a transparency layer.

DrawlloweenDay6

I’m having a really great time with #Drawlloween, but I’m not the only one doing this. There are active hashtags on twitter, tumblr and Facebook with tonnes of great artists taking part. Check out my other entries, or follow along on twitter. 

Drawlloween – Day 2

#Drawlloween Continues!

Today’s task was to draw a devil, so here you go:

drawlloween 2015 Devil

I’m a bit less happy with this one, I think the devil’s alright, but the background is a bit sloppy. I’m most pleased with the shading which really completed the picture for me. The little transparent tortured souls worked out well too.

Drawlloween – Day 1

I’m participating in Drawlloween this year, which is a really fun event for artists. The idea is that on each day of the month you draw something connected to Halloween from the official list. It’s a really cool event to see everyone’s different take on the same subject. I’ve included the list if you’d like to get involved.

12002124_10153022709871898_5640584167794754243_n-2

With that in mind, here’s my ghost for day one.

GhostDrawlloween

I’m pretty pleased with it, though the head turned out a bit more like Oogie Boogie than I was planning on. Oh well. More Drawlloween tomorrow!