Drawlloween – Day 6

Drawlloween Continues!

We’re on Day 6 – Pumpkin!

This one was a little bit different because I had a really clear idea of what I wanted to draw as soon as I saw Pumpkin on the list. I love Jack-O-Lanterns, and I’ve wanted to draw a big-cartoony Pumpkin Poster for a while. This is pretty much as I saw it in my mind. I drew it in Manga Studio, coloured using the basic fill in pen and then shaded using black inks over a transparency layer.

DrawlloweenDay6

I’m having a really great time with #Drawlloween, but I’m not the only one doing this. There are active hashtags on twitter, tumblr and Facebook with tonnes of great artists taking part. Check out my other entries, or follow along on twitter.