Day 4 of #Drawlloween is here!
Today is the vampire, check out my entry.
I think this one turned out better than the Goblin, though when I finished I was surprised to see how much the post match the Devil. Still, I like this one. I went for deep reads for the waistcoat and trousers. The inside of the cloak was going to be red too but there wasn’t a good enough separation between the body and the cloak. Probably my favourite part is the hands, which aren’t exactly anatomically correct, but have the nice horror- grip look I was going for.
Check out the other Drawlloween drawings here, or follow along on twitter.