Those Aren’t Biscuits – 033 – Windows 10 isn’t awful

Those Aren’t Biscuits is a weekly geek culture podcast pretending to be a professionally made comedy show. Hosted by Owen Adams and Jonathan Cadotte, it is probably the most important podcast in of the 20th Century. 

In this week’s Biscuits, radio sound effects, operating system talk, shout outs go wrong, and we’re both ill and tired.

As always, you can download directly or visit our Libsyn page, and subscribe on iTunes.